Accuracy and data policy
No accuracy figure is published until verified responses and confirmed outcomes exist and can be audited.
Accuracy reporting is not available yet
There are no verified predictions and no confirmed outcomes to compare, so nothing is estimated. The ledger below opens at zero and earns every entry.
- Verified records
- 0
- Confirmed outcomes
- 0
- Figures estimated
- 0
01 · Service
- PNR checksOperational
- Accounts and watchlist syncOperational
02 · What would have to exist first
- Live response
- A verified reservation responseEach record must come from a railway data source with its name and retrieval time attached.
- Observed outcome
- The final status at chart timeThe confirmed, RAC, or waitlisted outcome after the chart is prepared, recorded from the same source.
- Audit record
- Both, stored side by sideOnly when responses and outcomes exist together can an accuracy figure be computed and checked by anyone.